Your first sweep

This chains two fidelity-3 runs together with checkpoint restart — the mechanism every real sweep in this project is built on. See Checkpoint restart and warm-start chains for why it works the way it does; this page is just running it.

Run the smoke-test chain

uv run python scripts/chain.py config/chain_config_smoke.yaml

Expected output:

  [seg 0] run=46e365e1  omega_b=3.14  n_mix=5  t_end≈12.7  → job 4153341
  [seg 1] run=bedb814c  omega_b=6.28  n_mix=3  t_end≈11.6  → job 4153342

Chain submitted: ['4153341', '4153342']

Two SLURM jobs, --dependency=afterok between them — segment 1 won't start until segment 0 finishes successfully. Both are fidelity 3, so this whole chain finishes in under a minute of actual compute once it starts running.

Verify the restart actually happened

This is the check worth internalizing, because it's the one thing that tells you checkpoint restart is doing its job rather than silently starting cold:

head -1 runs/46e365e1/logstats.dat   # segment 0 -- should start at t=0
head -1 runs/bedb814c/logstats.dat   # segment 1 -- should start at t>0

Ours:

$ head -1 runs/46e365e1/logstats.dat
i: 0 t: 0 dt: 0.0507282 #Cells: 64 ...

$ head -1 runs/bedb814c/logstats.dat
i: 2278 t: 13.2 dt: 0.00666667 #Cells: 64 ...

Segment 1 picks up at t=13.2 — wherever segment 0's checkpoint.dump left off — not at t=0. If you ever see a restart segment starting at t=0, something is wrong with the chain (see Diagnose a stalled or failed chain).

Check both segments produced results

uv run python scripts/postprocess.py runs/46e365e1/
uv run python scripts/postprocess.py runs/bedb814c/

Each writes its own results.json — a chain doesn't aggregate results for you; see Output files reference.

What the restart actually looks like in the data

head -1 proves segment 1 didn't start cold, but plotting the same KPI across both segments' raw shear_stress.dat files makes it concrete:

tau_98 plotted against non-dimensional time across both segments, with a dashed vertical line marking the checkpoint restart at t≈13.2 — segment 1's curve continues smoothly from where segment 0 left off, no discontinuity.

Segment 1 (red) picks up tau_98 right where segment 0 (blue) left off — no jump, no reset. This is also the first thing to check if a chain looks suspicious: a real discontinuity at the restart boundary in any KPI is a sign something (fidelity mismatch, wrong checkpoint staged, a bug in the restart ramp) actually did perturb the physics — see Checkpoint restart and warm-start chains for a case where that's an open, actively-investigated question, not just a smoke-test check.

Next